AUGUST 2026 / READ THE REPORTED WORKS

From the wide view
to the work on site.

Watch the supplied Modon update with nine chapter readings. Move between building activity, the wider Wadi setting, roads, the Portaluna sequence and airport works.

93-second silent visual editionOn-screen month: August 2026Received: 25 September 2026

This is a developer-reported update. The on-screen month is retained; exact filming dates and locations are not independently verified. It does not measure how much of the city is complete. © Modon for the supplied visual sequence.

The complete original picture sequence is preserved in this silent edition. The readings are written by the guide. Choose a chapter, then use the player’s Play button.

Choose a chapter or play the update.

Complete August-labelled source frame for The city scale in the update
Frame at 0:06 · © Modon

0:00 / 0:13 · REPORTED WORKS

The city scale in the update

Captions in this chapter
170.8 million sqm masterplan

The area caption describes the masterplan. It does not say this much land had been built on or transferred.

Read the related guide section ↗
Complete August-labelled source frame for Foundations, structures and crews
Frame at 0:21 · © Modon

0:13 / 0:28 · REPORTED WORKS

Foundations, structures and crews

Captions in this chapter
310,000+ planned homes (15–18 seconds)

The planned-home count appears over a construction view. The following scenes show work at different stages, without identifying a buyer’s allocated home.

Read the related guide section ↗
Complete August-labelled source frame for The wider Wadi Yemm view
Frame at 0:36 · © Modon

0:28 / 0:39 · REPORTED WORKS

The wider Wadi Yemm view

Captions in this chapter
Development progress across multiple zones; Wadi Yemm

The source labels the wider view Wadi Yemm. This shows the setting around the visible works, without providing a surveyed precinct boundary.

Read the related guide section ↗
Complete August-labelled source frame for Road work and visible paving
Frame at 0:48 · © Modon

0:39 / 0:49 · REPORTED WORKS

Road work and visible paving

Captions in this chapter
Ras El Hekma Ring Road

Work crews, machinery and a paved road appear in this sequence. Its label identifies the ring road; it does not confirm visitor access or a usable entrance.

Read the related guide section ↗
Complete August-labelled source frame for Portaluna from outside
Frame at 0:51 · © Modon

0:49 / 0:54 · REPORTED WORKS

Portaluna from outside

Captions in this chapter
Portaluna Hotel

The source labels the buildings Portaluna Hotel. Landscaped and pool areas appear beside work areas. A completed-looking exterior is not a reservation confirmation.

Read the related guide section ↗
Complete August-labelled source frame for Inside and around the hotel sequence
Frame at 1:06 · © Modon

0:54 / 1:08 · REPORTED WORKS

Inside and around the hotel sequence

Captions in this chapter
August 2026

Lounges, terraces, corridors and reception-style spaces follow the Portaluna scenes. The guide does not independently identify an exact room or verify the filming location.

Read the related guide section ↗
Complete August-labelled source frame for The wider hotel setting
Frame at 1:09 · © Modon

1:08 / 1:13 · REPORTED WORKS

The wider hotel setting

Captions in this chapter
August 2026

The high view shows the relationship between buildings, pools, the shore and remaining ground works. It does not establish residence-owner access to hotel facilities.

Read the related guide section ↗
Complete August-labelled source frame for Airport structures and runway imagery
Frame at 1:15 · © Modon

1:13 / 1:17 · REPORTED WORKS

Airport structures and runway imagery

Captions in this chapter
Ras El Hekma International Airport

The update labels these scenes as the city’s international airport. They show structures and a marked paved strip, without confirming passenger flights or an airport code.

Read the related guide section ↗
Complete August-labelled source frame for The specific terminal claim
Frame at 1:18 · © Modon

1:17 / 1:33 · REPORTED WORKS

The specific terminal claim

Captions in this chapter
VVIP terminal: steel structure complete

The caption concerns one terminal’s steel structure. Finishing the equipment, passing official checks and opening to passengers are separate steps. The film ends with coastal views and publisher credits.

Read the related guide section ↗

Read the vision and the works separately.

The city-vision film illustrates planned homes and services. This update presents construction and hotel scenes. They are different kinds of evidence, with different dates. They are not matched camera views or a before-and-after survey.

For a particular home, ask for a report that identifies its building and work package. For a stay or journey, check the current hotel or transport operator.

How this footage was reviewed

The guide reviewed all 93 one-second interval images and nine exact-time chapter frames. This does not claim independent confirmation of every picture, location or filming date. The original audio remains in the private supplied file; this public edition is silent and does not claim an audio transcript.

All 2,325 encoded video frames are retained without re-encoding, cropping, overlays or picture changes. The source month label remains on the frames. The guide has not placed the film onto satellite imagery or inferred the boundary of a home or development.

The VVIP caption is about a steel structure. It does not say the whole airport is ready for passengers. Hotel interiors and landscaped parts can appear alongside unfinished exterior areas. The update does not verify guest opening, visitor access or a home handover date.

Source record and guide review ↗ · Keep reading the earlier seven stills ↗. The earlier source reading remains available.